Risk assessment method

Last checked on

This is where you agree how risks are weighed: the scales for likelihood and impact, where low turns into medium and medium into high, and up to which score the owner of a risk may accept it.

Why this protects your organisation

If two colleagues rate the same risk differently, your risk register tells you very little. A fixed method means everyone measures with the same yardstick, this year's risks can be compared with last year's, and it is clear who may accept a large risk. ISO 27001 clause 6.1 asks for a documented approach like this, so that repeating an assessment gives comparable results.

Steps

  1. Open Risk assessment method in the Risks group. A new workspace already has a draft with a five level scale for both likelihood and impact.
  2. Adjust the levels under Likelihood scale and Impact scale where needed. Level 1 is the first entry.
  3. Fill in Low threshold, Medium threshold and Acceptance threshold.
  4. Click Save. An administrator then clicks Establish.
  5. To change something later, click Start a new version. The established version stays in force until you establish the new one.

How the score works

A risk scores likelihood times impact. With the default five by five scale, scores therefore run from 1 to 25. At or under the Low threshold the risk level is low, at or under the Medium threshold it is medium, and anything above that is high.

Accepting risks

The Acceptance threshold sets the highest score at which the owner of a risk may accept it themselves. An administrator may do so too. Above it, only an administrator may accept the risk. An advisor or auditor who owns a risk does not accept it. That way nobody takes on a large risk on behalf of the organisation without the right mandate. Older versions of the method still named a role here; that choice no longer counts.

Versions

The method is versioned. The top of the page shows the established version, with who established it and when. A change starts as a new draft and only takes effect once you establish it. Until a version has been established for the first time, you cannot choose likelihood and impact on a risk.

If you use the default scales, every user sees them in their own language. If you have changed a scale, it appears exactly as you wrote it.

The new screen opens the default matrix only when you explicitly start a draft. Viewing the page does not create or establish a version. Add, remove or move scale levels using the labelled buttons. Save before establishing: confirmation establishes the saved draft. Published versions remain read only; changing them starts a new draft. Editing follows the Risks and controls permissions. Only an administrator establishes.

If it does not work

I only see the established method, not a form

An established version can no longer be edited. Click Start a new version to open a draft that starts from the current values.

I do not see Save or Start a new version

Those are available to the workspace administrators and editors. An advisor needs edit rights on the Risks and controls module.

I do not see Establish

Only an administrator establishes the method. An editor can still prepare and save the draft.

Saving fails

Each scale needs at least two levels, each level needs a name, and the Medium threshold must be higher than the Low threshold.